Construction Change Order Generator & Template

Write up extra work — or a credit — before you start it. Enter the original contract sum, the materials, subcontractor and labor costs of the change and your markup. The generator works out the change order amount, the new contract sum and the time change, then produces a printable change order form ready for both signatures.

Formula checked 24 Oct 2026 Free · no sign-up
Was this calculator helpful?

Found a bug or have a suggestion?

Leave it here and we will fix it and reply to you.

Embed this calculator on your website (free)

Copy this code into your page. It stays free and updates automatically.

How to use the change order generator

  1. Enter the original contract sum and the net total of any change orders already approved.
  2. Choose whether this change adds work or removes work (a credit).
  3. List the materials, subcontractor quotes and other costs, then your labor hours and rate.
  4. Set your overhead & profit markup and the change in contract time.
  5. Open “Turn this into a printable change order”, describe the change, and print it or save it as a PDF for both parties to sign.

How the change order is calculated

Cost of change = materials + subcontractors + labor + equipment Markup = cost × O&P % Change order = ± (cost + markup) Prior sum = original sum + previous change orders New contract sum = prior sum + this change order

Worked example

The owner asks for two extra recessed lights on a $48,500 kitchen remodel. Lights cost $42 each, the electrician quotes $380, and your crew needs 6 hours at $65. With a 15% markup:

  • Cost of change = $84 + $380 + $390 = $854.00
  • Overhead & profit = $854 × 15% = $128.10
  • Change order = $982.10 (about 2% of the original contract)
  • New contract sum = $48,500 + $982.10 = $49,482.10, plus 1 day

What goes on the printed change order

The form follows the structure of widely used industry change order forms such as AIA G701:

  • Your business details and logo, the owner or client, the project and a change order number and date.
  • A description of the change — what is added, removed or substituted, and where.
  • The contract sum history: original sum, net change by previous change orders, sum before this change, this change, and the new contract sum.
  • The change in contract time, in days.
  • An itemized cost breakdown with the markup shown as its own line.
  • Space for the contractor and owner to sign and date.

Change order best practices

  • Get it signed before you start. A verbal “go ahead” is hard to prove later. Write the change up the same day and get a signature before ordering materials.
  • Number every change order in sequence (CO-1, CO-2…) so the running contract total is always clear.
  • Price the time, too. Extra work often delays other trades. If the change adds days, say so on the form.
  • Follow your contract. Many contracts set the markup allowed on changes, how they must be requested and who can approve them.
  • Don’t forget credits. When the owner deletes work, issuing a fair credit builds trust and makes your add-on change orders easier to approve.
  • Unknown cost? If the cost can’t be fixed in advance — hidden rot, for example — agree to do it on a time-and-materials basis and record it daily with the T&M ticket calculator.

Rules on written change orders vary. California, for example, requires change orders on home-improvement contracts to be in writing and signed by both parties before the extra work begins. This tool helps you prepare the document; it is not legal advice.

Frequently asked questions

What is a change order?

A change order is a written agreement between the contractor and the owner that changes the scope of work, the contract sum, the contract time, or all three, after the original contract is signed.

What should a change order include?

The project and parties, a clear description of the change, the cost breakdown, the change in contract sum, the new contract sum, any change in contract time, and signatures and dates from both parties.

What markup is normal on change orders?

Overhead and profit of about 10–20% is common, but many contracts set the allowed markup for changes, sometimes with a lower rate on subcontractor work. Always follow your contract.

Should I start the extra work before the change order is signed?

It is safest not to. Unsigned extra work is the most common source of payment disputes, and some places require it in writing — California, for example, requires home-improvement change orders to be in writing and signed before the work starts.

How do I show a credit for deleted work?

Choose “Removes work (credit)”. The amount becomes negative, and the new contract sum goes down by the cost of the deleted work plus the markup on it.

Is my information saved?

Your business details and logo are saved only in your own browser so you don’t have to retype them. Nothing is uploaded to our servers.

How we checked this calculator

We test this tool against worked examples before every release (last check: 24 Oct 2026, version 1.0.0). Results are estimates for planning — confirm critical figures with your supplier or a qualified professional.